NRU: Piloting bike lanes on Bloor: Design Options

“Pending council approval the pilot lanes are expected to be installed in the summer. During the pilot staff will continue to monitor the impacts of the lanes on mode-share in the corridor. As well, local BIAs and the Metcalf Foundation have retained the Toronto Centre for Active Transportation to undertake a study about the economic impact of bike lanes on Bloor that will run in tandem with the pilot project to further inform the city’s analysis of the pilot’s results.”

Read full article here.


Posted On: December 4, 2015